How MGN Civil transformed ground improvement at the Port of Brisbane

MGN Civil embarked on an ambitious ground project to aid water drainage and support long-term stability at the Port of Brisbane. Tens of thousands of vertical shafts needed to be drilled, generating detailed data through onboard Trimble GPS devices. With manual processes overwhelmed by the sheer volume of data, the team worked with Safe Software partner Locus to develop an automated solution with FME.
Port of Brisbane aerial view Port of Brisbane aerial view

This story was made in collaboration with Safe Software partner Locus.

Handling large volumes of data in a 24/7 operation

At the Port of Brisbane, MGN Civil undertook an ambitious ground improvement project to aid in water drainage on reclaimed land and support long-term stability and performance. The project required drilling tens of thousands of “wicking holes,” or vertical shafts, reaching depths of 20 to 35 metres.

MGN Civil project at the Port of Brisbane

Beyond the engineering complexities of drilling, another challenge came from the sheer amount of data involved in this 24/7 operation.

The constant stream of data produced throughout operations was too much for existing manual processes to keep up with. Each drilling operation generated 2 XML files via onboard Trimble GPS devices, capturing precise location data and telemetry such as depth, penetration rate, and percussion. Field teams were tasked with manually downloading these files, processing them using Excel macros, and validating the results to ensure compliance with contract specifications.

This process took 2 team members up to 6 hours daily and was prone to errors, especially when macros failed or produced inconsistent outputs.

Drilling rig on site at the Port of BrisbaneThe consequences of delayed or inaccurate data processing were costly. Any non-compliant or missing holes identified after the drilling rig had moved required the repositioning of equipment, which was an inefficient and expensive process.

Automation, accuracy, and a smarter workflow

Safe Software partner Locus worked with MGN Civil to reimagine this workflow using FME. The solution was built iteratively, allowing the team to respond to real-world constraints and opportunities as they came up. MGN Civil and Locus adopted an agile approach, working collaboratively to refine the solution to meet evolving requirements and operational insights.

An FME workspace was created to ingest and process XML data via Trimble Connect Cloud, with results loaded into a File Geodatabase. A second workspace handled daily reporting, automatically generating standardized Excel outputs, graphs visualizing sensor information, PDFs for each hole, and a daily summary report. Outputs were published as an ArcGIS Online Map Service and pushed to an Amazon S3 bucket, giving field teams immediate access to the data with no downloads or spreadsheets required.

Real-time decisions in the field

To make the data even more actionable, Locus developed a real-time dashboard and Web Map in ArcGIS Online. With it, project teams could instantly see which holes had been drilled and whether they met all compliance standards. If an issue was detected, crews could act quickly while the rig was still on site.

The impact was dramatic, as what one took days now took minutes. Missed or non-compliant holes could be identified and fixed before they became an expensive problem. Accuracy improved and staff were freed from repetitive tasks.

Navigating technical challenges

FME played a key role in solving some of the intricate challenges presented throughout this infrastructure project. The Port of Brisbane used a custom coordinate system called Fisherman Island Grid (FIG). While FME handled the projection cleanly, a wrinkle in a device output reversed the expected X and Y coordinates. Solving this with FME meant the location data was reliable from day 1. When the Esri platform didn’t support local Affine transformations, FME was used to reproject the geometry to supported projection.

A new standard for civil engineering data

MGN Civil’s shift to an automated, real-time data pipeline has delivered more than just operational efficiencies. It has set a new benchmark for how civil infrastructure projects can use spatial data for live decision-making.

By removing manual bottlenecks, the team gained speed, visibility, confidence, and control, all without sacrificing the precision required for this project.

90%+
time savings in managing data
“This automated data solution has transformed our operations at the Port of Brisbane. What previously consumed 4-6 hours of staff time daily, now takes minutes, and we identify issues immediately rather than after equipment has moved on. The real-time visibility has not only improved our compliance rate but also accelerated our decision-making process.”
Greg Lauer
MGN Civil